Territorial Hall HVAC Replacement
The work includes new rooftop mechanical equipment and ductwork, duct shafts and casework modifications to resident rooms, updated building electrical service, and the replacement of existing roofing. bank. The project adds outdoor air to the HVAC system to improve humidity levels and indoor air quality in the building, consistent
with recent residence hall HVAC projects on campus.
Project | Territorial Hall HVAC Replacement |
---|---|
Design | NV5 |
Construction | LS Black |
Gross Square Footage | N/A |
Project Cost | $32,000,000 |
Construction Start | February 2024 |
Completion | September 2025 |