Dwan Third Floor Lab Renovation
The proposed renovation to Dwan third floor will co-locate research laboratories for faculty of the Division of Molecular Medicine. This co-location into an open contemporary wet lab space will give them access to shared equipment and core facilities, including procedure rooms, tissue culture rooms, microscopy, mass spectrometry, and linear equipment rooms. From a practical standpoint, Dwan’s third floor is centrally located between the hospital and other research buildings within Health Sciences District, and this work will allow for enhanced collaboration as well as other administrative efficiencies.
Project | Dwan Third Floor Lab Renovation |
---|---|
Design | Alliiance |
Construction | JE Dunn Construction |
Gross Square Footage | 17,800 |
Project Cost | $12,125,000 |
Construction Start | April 2023 |
Completion | February 2024 |