Standard Blog

Standard Blog

Displays three most recent posts with pics in main content region, with remaining posts (sans pics) in the right sidebar.

Chem Teaching

Twin Cities Campus | East Bank - The proposed Chemistry Undergraduate Teaching Laboratories will replace, improve, and consolidate outdated general and organic chemistry teaching laboratories and support spaces, currently in Smith and Kolthoff Halls, to Fraser Hall on the East Bank campus.

faarm

Mower County, Minnesota: The Future of Advanced Agricultural Research in Minnesota (FAARM) project will design and construct an integrated agricultural research complex to collectively improve the health of plants and animals, soil, climate, economy, and people. FAARM will be located in the ag-bioscience-rich area of Mower County, Minnesota.

Atrium

Twin Cities Campus | East Bank: Renovation of the existing CSOM Building located on the West Bank of the Twin Cities campus. The renovation work will include architectural, structural, mechanical, and electrical systems.

Standard Blog - More Posts

This project is primarily an equipment replacement project that replaces an existing cart and tunnel washer with like equipment to support research operations within the Molecular and Cellular Biology (MCB) Building.

Duluth Campus:  The Duluth campus Main Production Kitchen (MPK) was designed in 1971. The existing kitchen is more than fifty years old, and other than some equipment replacement and minor additions, the space is sized and orientated to support an operational model that no longer fits the culinary needs of the modern university student.

Twin Cities Campus |East Bethel: The fully accessible single-story addition to the Lindeman Center is 3,320 GSF. The addition will encompass site improvement, utility upgrades, and replacing the existing septic system.

Twin Cities Campus |East Bank - Dwan Variety Club Cardiovascular Research Center (Dwan) was built in 1972 and consists of three floors (Levels 1-3).  Level three is currently used for research labs and offices. The total renovation area of 17,800 GSF will demolish interior partitions, mechanical, electrical, plumbing, fixtures, equipment, and finishes to provide all new construction for modern, flexible research labs.

Twin Cities Campus | East Bank: This project renovates a 1,200 SF underutilized space in Moos Tower, room 1-712, to accommodate a new MRI for dental imaging. The scope includes asbestos abatement, minor demolition, and build-out of a suite of rooms to support a Magneton Free Max .55T MRI unit.