Standard Blog

Standard Blog

Displays three most recent posts with pics in main content region, with remaining posts (sans pics) in the right sidebar.

Chem Teaching

Twin Cities Campus | East Bank - The proposed Chemistry Undergraduate Teaching Laboratories will replace, improve, and consolidate outdated general and organic chemistry teaching laboratories and support spaces, currently in Smith and Kolthoff Halls, to Fraser Hall on the East Bank campus.

faarm

Mower County, Minnesota: The Future of Advanced Agricultural Research in Minnesota (FAARM) project will design and construct an integrated agricultural research complex to collectively improve the health of plants and animals, soil, climate, economy, and people. FAARM will be located in the ag-bioscience-rich area of Mower County, Minnesota.

Atrium

Twin Cities Campus | East Bank: Renovation of the existing CSOM Building located on the West Bank of the Twin Cities campus. The renovation work will include architectural, structural, mechanical, and electrical systems.

Standard Blog - More Posts

Twin Cities Campus |East Bank: Renovate all of 3rd and 4th Floors along with select areas of Level 5 within Shepard Hall.  Scope includes infrastructure system upgrades and compliance with SB2030 sustainability goals.

Twin Cities Campus |East Bank: New Women’s Gymnastics Team Practice Facility for the University of Minnesota Athletics Department

Twin Cities Campus |East Bank: The Temporal Bone Lab, long a crown jewel of the University of Minnesota Medical School's Department of Otolaryngology, Head and Neck Surgery, needs revitalization to ensure that the next generation of otolaryngologists is prepared to meet the needs of those with hearing loss throughout Minnesota and beyond.

Twin Cities Campus | East Bank:  Phase 1 will replace the ice refrigerant systems in 3MAM and Ridder Arenas along with reducing the ice size and upgrading ice lighting in 3MAM. A future Phase 2 scope will further improve the fan experience, hockey team amenities, facility upgrades, and overall facility enhancements to celebrate 100 years of Gopher Hockey. 

The Territorial Hall HVAC replacement project renews heating and cooling systems for resident rooms and public spaces in the building to provide continuity of operations for this student housing building in the Superblock on the east bank.