This Project integrates several utility and roadway improvement needs into one coordinated design and construction effort.  The scope of work includes the following:

  • Expand the chilled water network from the new Main Energy Plant to the Knoll area to meet east bank campus distribution needs
  • Reconstruct deteriorated roadway corridors, parking areas, and sidewalks
  • Upgrade water and sewer systems including mains and service connections
  • Consolidate and optimize service access points and vehicle parking areas
  • Repair shallow utility tunnels, replace electrical duct
  • Renew exterior lighting and add security cameras
Phase II Construction May 14th 2020 - September 4th 2020