st paul campus center
Saint Paul Campus Center

The St. Paul campus will be a visible and visionary link between the University’s land grant mission, the community, the state of Minnesota, and the world. It will proudly demonstrate the sustainable intersections of urban and rural environments, natural ecosystems and technology, and applied knowledge and academic discovery in a culture where all individuals are valued, respected, provided an opportunity to flourish, and unobstructed in their pursuit of excellence. The University units that will occupy and manage spaces in the new building and participate as stakeholders in the project include Student Unions and Activities for student union spaces,  University of Minnesota Libraries for library spaces, M Food Co. for campus dining spaces, University of Minnesota Bookstores for bookstore spaces, College of Continuing and Professional Studies for two classroom spaces.

ProjectSt. Paul Campus Center
DesignAlliiance
ConstructionM.A. Mortenson
Square Footage94,792 GSF
Project Cost$140,000,000
Construction StartNovember 2026
CompletionApril 2029

 

Construction updates

Expand all

Construction updates

Project Webcam

September 2026 Message from Vice President Alice Roberts-Davis

Greetings,

As construction that will pave the way for a new St. Paul Campus Center begins, we are sharing some operational updates and impacts for students, faculty, staff and visitors. Please review and share the information below.

The Magrath Library building in St. Paul will permanently close on Sept. 21.

As you know, this closure is an early step in our plans for the new campus center, which will include a library and student center and will be built on the current Magrath Library site. Magrath Library has been closing in phases since last spring. Sept. 21 will mark the final closing of the building, including the College of Continuing & Professional Studies classrooms and study spaces. Construction preparation and demolition activities will follow through spring 2027.

The University of Minnesota Libraries will continue to provide a full suite of library services at the St. Paul Campus Library located in Hodson Hall.

Some walking routes, including the Gopher Way, will also close until the new campus center opens in 2029.

Starting Sept. 21, the Gopher Way will be closed between Ruttan Hall, Magrath Library and the Learning and Environmental Sciences building. There will also be periodic closures of sidewalks and streets at key points in construction.

The new campus center will restore the critical link in the Gopher Way system, which will reconnect Ruttan Hall and Learning and Environmental Sciences. The Gopher Way between the new campus center and Gortner Avenue Ramp will be enhanced by an interior connection.

Ruttan Hall, Gortner Avenue Ramp and Learning and Environmental Sciences will experience construction impacts.

Ruttan Hall and Magrath Library are connected buildings that must be detached in order to demolish Magrath Library. This process will close several general purpose classrooms in Ruttan Hall until 2029, and there will be temporary corridors in some places during construction. Other classrooms near construction will remain open but will experience periodic noise, vibration and access changes.

Work on the Gortner Avenue Ramp connection will require relocating pedestrian entrances/exits for the duration of construction.

The Learning and Environmental Sciences building loading dock will experience periodic closures that could affect deliveries. These will be communicated as they are scheduled.

Construction may affect accessibility, including the Gopher Way closure and Gortner Avenue Ramp work.

Students, employees or visitors who need accommodations should contact the Disability Resource Center. They will work with other departments as needed, for example on special parking arrangements during construction.

We will provide construction updates — including photos and a project webcam — on the Capital Project Management website.

Thank you for ensuring your building users and stakeholders are informed.

Alice Roberts-Davis
Vice President
University Services

September 2026 Construction Impacts Slide Presentation

November 2026 Construction Updates

  • The removal of furniture, equipment and belongings in Magrath library is complete 
  • The Gopher Way has been shut down through Magrath Library
  • Limited site fencing is in place for abatement phase
  • Hazardous material abatement is underway 
  • Webcam is now available (above)

Frequently asked questions

Expand all

Frequently asked questions

Will I still be able to park in the Gortner Avenue parking ramp?

Yes. Pedestrian entrances/exits will be temporarily relocated. The northwest elevator lobby will be closed for the majority of the construction duration, and the southwest pedestrian lobby will be upgraded to be the accessible entry/exit.

Will Ruttan Hall be open/accessible during construction?

Yes. However, there will be temporary barriers for the duration of construction, and some classrooms will be closed.

Where are library services provided during construction?

Library services have moved to Hodson Hall. Library administration has moved to Coffey Hall room 90. Tutoring is located in the St. Paul Student Center. Both Hodson Hall and the St. Paul Student Center have extended hours for study space. View additional information.

Are there alternative accessible routes from the Gortner Avenue parking garage?

Yes. Door operators are being added to some of the Gortner Avenue parking garage egress points. Best route is exiting the southwest door and utilizing the sidewalk connecting Ruttan Hall to connect to the Gopher Way up to Buford Avenue. The east side doors of Gortner Ramp will also be available but the existing sidewalks on Gortner Avenue do not meet current ADA accessibility requirements.

Will there be dust associated with construction?

As with any building demolition activity, dust will be generated. Water is sprayed on debris as demolition occurs to minimize dust migration to adjacent areas.

Where do I get construction updates?

Updates will be available on the Capital Project Management website. A construction webcam will also be available on the site soon.

Who do I notify if I have questions or concerns about construction?

Immediate concerns should be directed to the Facilities Management Call Center at [email protected] or 612-624-2900. Non-urgent questions can be sent to [email protected]. 

Are bus routes affected?

Campus bus routes are not anticipated to change during construction.

Are sidewalks closed?

The sidewalk on the south side of Buford Avenue will be closed for the duration of construction. Sidewalks on the south side of the project will be periodically closed. Signage will be provided.

Who do I contact if I have an issue with accessibility?

Contact the Disability Resource Center at [email protected] or 612-626-1333.

Will the Learning and Environmental Sciences Building be open/accessible during construction?

Yes. However, there will be temporary barriers for the duration of construction.

Will the Gopher Way be open/accessible during construction?

The Gopher Way is closed between Ruttan Hall, Magrath Library and the Learning and Environmental Sciences Building during construction. The new campus center will restore this critcical link.

Tree management

Expand all

Tree management

Why are trees being removed?

The St. Paul Campus Center project requires changes to the surrounding landscape, including along Buford Avenue, to accommodate building construction, utility access and other site improvements. Several dozen trees are expected to be removed throughout the site prep, demolition and construction process. Our Landcare team has evaluated trees based on size, species, condition and location to identify opportunities for preservation and relocation.

What is being done to preserve existing trees?

The University is working to preserve trees where feasible, prioritizing based on size, maturity and significance to the campus landscape. Protection measures will include fencing around the canopy line to prevent soil compaction that can damage tree roots, minimizing root damage during excavation and providing additional water to help trees withstand construction-related stress. The project team and Landcare assessed existing trees and identified opportunities to preserve or relocate them. As a result, one large bur oak will be preserved on site, and eight trees have been identified for relocation.

What are the plans for planting new trees?

Preliminary landscape plans include approximately 35-40 new trees following construction. Removed trees will be replaced at a 1:1 ratio, with new trees planted on the St. Paul Campus Center site or elsewhere on the St. Paul campus. The University's Landcare team, including its arborists and landscape architect, guides tree planting decisions using established standards for tree health, species diversity and long-term care of the campus urban forest. In alignment with the University's Tree Management Plan, new plantings will provide opportunities to introduce a wider variety of tree species, strengthen resilience to pests, disease and changing climate conditions and support long-term tree canopy coverage. These considerations are also addressed in the Twin Cities campus Climate Resilience Plan.