UMD Kirby Drive Reconstruction
The reconstruction of Kirby Drive on the Duluth campus located between W. College St. and St. Marie St. This critical corridor through the heart of the campus requires a design solution that analizes immediate restorative needs with long-term campus planning considerations. Project to scope new in-kind road replacement with alternate studies for the UMD Climate Campus Action Plan improvements.
| Project | UMD Kirby Drive Reconstruction |
|---|---|
| Design | TBD |
| Construction | TBD |
| Square Footage | N/A |
| Project Cost | $2,000,000.00 |
| Construction Start | TBD |
| Completion | TBD |