Washington Ave Bridge
Washington Avenue Bridge - Railings and Lighting Design (Perm.)

Washington Avenue Bridge requires replacement of the existing perimeter railing and lighting system. Design services are required for the engineering of a new permanent railing and lighting system that can be supported by the existing bridge design. 

ProjectWashington Avenue Bridge - Railings and Lighting Design (Perm.)
DesignBolton & Menk
ConstructionLunda Construction
Square FootageN/A
Project Cost$8,175,000.00
Construction StartJuly 2026
CompletionOctober 2026